A Life Saving Ventilator Supply Chain Ramp Up

Customer Issues

  • Life saving highly-portable ventilator technology with 100X surge demand created immediately due to the Covid-19 pandemic
  • Customer’s supply chain and production capacity was insufficient to meet demand for 100,000+ ventilators to be produced in 3-4 months, and a major contract under the Federal Defense Production Act
  • Customer’s suppliers traditionally providing lower volume and one-off jobs, lacking engineering expertise, materials and processes to support rapid launch and high- volume production rates needed
  • High Stakes: Every day of delay in delivering a ventilator to doctors meant there were potential lives being lost
 

The AWT Solution

  • Full Portfolio coverage of functional components, labels, tags and booklet products for the ventilator product and manufacturing operation
  • Rapid in-house design support and materials testing to meet product requirements. 
  • Part launch time compressed to under 2 weeks using accelerated process and material commonization
  • Rapid scale-up to full production volumes in under 3 weeks to support greenfield facility supplying 80,000 ventilators
  • Supply planning integration with customer’s rapidly developing operating system and highly volatile demand forecast
 

Written By:

Category:

Posted On:

From Shrink Sleeve to Labels

From Shrink Sleeves to Labels. Whether you’re managing hundreds of SKUs, responding to new regulations, or elevating your brand’s shelf presence, packaging flexibility has never been more critical.

Read More

Collaborative Forward-Thinking Innovation

A global point-of-care (POC) diagnostics startup was preparing to launch an innovative new product but faced a critical production challenge. Their blood diagnostic tests featured a unique disc design, incorporating various sealing tapes and labels that required precise placement. The pressing question: could they maintain tight tolerances in positioning without triggering an unintended chemical reaction during the production process?

Read More

Written By:

Category:

Posted On:

Updated On:

Customer Issues

  • Life saving highly-portable ventilator technology with 100X surge demand created immediately due to the Covid-19 pandemic
  • Customer’s supply chain and production capacity was insufficient to meet demand for 100,000+ ventilators to be produced in 3-4 months, and a major contract under the Federal Defense Production Act
  • Customer’s suppliers traditionally providing lower volume and one-off jobs, lacking engineering expertise, materials and processes to support rapid launch and high- volume production rates needed
  • High Stakes: Every day of delay in delivering a ventilator to doctors meant there were potential lives being lost
 

The AWT Solution

  • Full Portfolio coverage of functional components, labels, tags and booklet products for the ventilator product and manufacturing operation
  • Rapid in-house design support and materials testing to meet product requirements. 
  • Part launch time compressed to under 2 weeks using accelerated process and material commonization
  • Rapid scale-up to full production volumes in under 3 weeks to support greenfield facility supplying 80,000 ventilators
  • Supply planning integration with customer’s rapidly developing operating system and highly volatile demand forecast